2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国
1/40

US$7,200,000 USD

商用出售, 2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国

  • MLS#21068859
  • 168,563 m² (1,814,400 ft²)

列出者 Coldwell Banker Apex, REALTORS

位于 2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国 待售的 商业地产 为目前正在出售2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国 已为 US$7,200,000 列出。

最新日期: 2025年11月7日
Sean Peterson
Coldwell Banker Apex, REALTORS

房产特点

房产

  • 房产面积: 168,563 m² (1,814,400 ft²)
  • 特色: 车库

地块/土地

  • 土地/地块面积: 4 m² (40 ft²)

结构

  • 建造于: 2017
  • 房屋状况: 转售
  • 结构: 金属水泥/砌块
  • 地下室和地基详情: 混凝土板

停车场/车库

  • 车位描述: 停车场门控停车场露天停车场
  • 车库描述: 工作室/工作台区超大型

内部特征

  • 地板: 塑胶地板混凝土

安全

  • 特色: 防火墙消防洒水器防盗窗闩

供暖和制冷

  • 暖气系统: 电能中央
  • 冷气系统: 吊扇电能中央

水电煤气

  • 其他配套设施: 自来水独立水表污水下水道

描述

Built to support major mining operations for AEP SWEPCO and CLECO, this robust 72,000 SF industrial complex on a 40-acre site offers everything a large-scale operator demands—office infrastructure, warehouse capacity, and a world-class maintenance shop. Office & Administrative Headquarters – 20,725 SF • 30 private offices designed for executives, engineers, and staff • Two conference rooms (one large, one small) for team meetings and presentations • Expansive training rooms to support workforce development • Fireproof file vault for secure record storage • Large men’s and women’s restrooms, each with showers and locker facilities • Two full kitchens with sinks, counters, and cabinetry for employee convenience Warehouse & Secure Storage – 9,881 SF • Ideal for tooling, parts, and equipment storage • Heavy-duty racking and caged secure storage areas • 24’7” interior clear height for vertical storage efficiency • Two truck wells (one with load leveler), semi-dock-height dock, and grade-level door for flexible logistics Dual-Crane Maintenance Shop – 42,000 SF • Massive ceiling height of 52’7” for large-scale equipment and heavy vehicles • 10 oversized overhead doors (28’8” x 28’) for seamless access • Four walking bridge cranes (three 10-ton and one 20-ton capacity) for maximum lifting capability • Purpose-built to accommodate heavy industrial, mining, and energy operations Secure Yard & Site Improvements • Fully fenced 6’ cyclone perimeter with barbed wire for security • Reinforced concrete apron around the building for heavy equipment maneuvering • Majority of yard rock SB2 stabilized, engineered for mining and earth-moving vehicles • Yard and surface areas remain in excellent condition • On-site water storage-fire suppression system that is part of the building complex

位置

2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国

2002 Crow Lane, Pelican, 路易西安纳州 71063, 美国